ASIA PIPELINES
January 2025 we are working for SRB-NBPT-LL pipeline at Saraburi-Angthong 52 km. Work for topographic survey for detail design stage.
Survey Item
- GPS Static network
- Topographic survey
- Photogrammetry
- Created natural ground surface, contour, profile and cross section.